What needs to be resolved
The key was selecting less strategic parts and preparing them for external manufacture. Documentation, sampling and delivery frequency must align with internal assembly. PARTORY supplies the agreed components while the customer controls what stays in-house. External manufacture addresses a specific bottleneck, not unlimited reserve capacity.
How we add capacity for production growth
Identify capacity constraints
We review the growth plan and operations limiting throughput, distinguishing a short demand peak from a lasting need for more capacity.
Select parts to transfer
We assess which parts PARTORY can supply to relieve the actual bottleneck, confirming documentation, volumes and links to your internal assembly.
Validate a production batch
Samples or a pilot batch verify the required dimensions and application. We agree inspection, packaging and terms for repeat production.
Align deliveries with growth
We set forecasts, batches and dates around your production. When demand changes, we reconfirm available capacity and adjust the delivery plan.
What to verify for a similar requirement
Verify technical conformity, a price covering the same scope, the actual lead time and introduction into your production. One project’s benefit is not an automatic outcome for every order. Results are assessed against agreed requirements and actual deliveries.